Which processes to automate first: a simple scoring method
Score each process on hours, clarity, data readiness and risk, check payback, then automate the top one or two. Worked example and pass/fail test.
Production schedule requests, downtime, supplier chases and shift handovers tracked in one place, so nothing is lost between shifts.
On a plant floor, the same requests come up every shift: can this job move up the schedule, when is line two back, has the resin supplier confirmed, what happened overnight. This edition gives supervisors and planners one place to raise and track them. It logs schedule requests for the planner, tracks maintenance and downtime, chases suppliers and writes the shift handover brief. Exceptions go to a named approver.

AI Operations Assistant for Manufacturing is an internal assistant for plant managers, supervisors and planners. It takes production scheduling requests, logs maintenance and downtime, follows up with suppliers on late materials and prepares shift handover briefs, all on one channel. It reads from your ERP exports and procedures, and sends anything outside your rules to an approver.
Most plant problems are not dramatic. A schedule change is agreed in the corridor and never recorded. A machine fault is reported to one shift and forgotten by the next. A supplier misses a confirmation and nobody chases it until the line is short. Supervisors spend the start of every shift rebuilding what happened. This edition records requests as they happen, follows up on the ones that stall and hands each shift a clear brief. Planners and approvers stay in control of every decision that matters. The Scope Card fixes what is built before you order.
Production scheduling requests come into one channel and are handled using your manufacturing workflow template. Anything outside your rules goes to a named approver instead of being guessed at.
The assistant logs maintenance and downtime as supervisors report it on the channel. Records follow the same format each time, so they are ready for weekly review.
The assistant follows up with suppliers on late materials, reading from your ERP exports. Planners hear about gaps earlier and can adjust the production schedule in good time.
The assistant prepares shift handover briefs from the day's logged activity. The incoming shift starts with the same picture as the team that is leaving.
Your portal lists these the moment you order. Delivery starts the working day after everything is in and your access is checked.
| Option | Delivery time | Price |
|---|---|---|
| Standard | 20–30 working days | $7,600 |
| Express | 15–25 working days | $8,750 |
| Rush | 10–20 working days | $9,900 |
Before you start: Record a month of downtime logs, late-material delays and handover problems before launch.
These are things to track, not promised results. Outcomes depend on your data, your team and your market.
The build is paid once. To run it, expect roughly $50 to $250 a month in AI model usage and hosting, billed in your own accounts on top of your ERP, document storage and Microsoft or Google plans.
Usage while building and testing is billed to your accounts as well, so no provider sits between you and your data.
Ask about running costsA third system such as an MES or a maintenance management system, a second channel, or more than one site with different procedures needs a Change Quote. Add a note at checkout for a written quote.
Request a custom versionOptional monthly maintenance covers monitoring, fixes and monthly change hours, for revised procedures, new lines, new suppliers or changed shift patterns. It starts after the 30 days of support.
$380/mo (5% of the build price a month, includes 3 change hours)
Optional. Starts after the post-launch support period. Cancel any month.
How maintenance works| Do it yourself with a SaaS tool | Hire a custom agency | Upmark Labs | |
|---|---|---|---|
| Price | A maintenance or scheduling module is licensed per user | A systems integrator quotes after a site visit | Ours is one fixed price, shown on this page before you buy |
| Plant requests | Each module covers one type of request | Depends on the brief | Ours takes schedule, downtime and supplier requests in one channel |
| Shift handover | A blank form the outgoing supervisor fills in | An agency build depends on what was agreed | Ours writes the brief from what was logged during the shift |
| Delivery | ERP projects often run for months | An agency usually takes several weeks, set per project | Ours has a fixed delivery time shown before you buy, with faster options |
Not by default. Schedule change requests are recorded with the job, the reason and who asked, then checked against your ERP exports and sent to the planner, who decides. If you later want small, rule-based changes written back automatically, that can be added as one of your approval rules, so a person still sets the limits.
A supervisor or operator reports the fault on the channel with the line or machine. The assistant logs the start time, notifies the maintenance owner on your contact list and follows up until the job is closed and the line is running again. Downtime records stay in your connected system, so you can review them later.
Each brief covers the shift that just ended: open faults and downtime, schedule changes requested or approved, supplier issues still open and anything waiting for an approver. It is built from what was logged during the shift, so the outgoing supervisor does not write it from memory. You choose the recipients and the timing for each shift.
You set the rules during intake, for example chase a missing order confirmation after a set number of hours, or ask for a revised date when a delivery slips. Follow-ups go by email from an address you control, and replies are recorded against the order. New suppliers, price changes or anything outside the rules go to a buyer or manager first.
Up to two systems with read and write access are included. Plants usually choose their ERP, through exports or an API, and their document storage. Microsoft Teams or email is the channel for the team. A third system, such as an MES or a maintenance management system, needs a Change Quote, which you get in writing before any work starts.
Yes. Shift times and handover recipients are part of the setup, so a plant running two or three shifts gets a brief at each change. Weekend and rotating patterns work the same way, as long as they are written down. A second site with its own procedures and approvers needs a Change Quote.
Mostly documents you already keep: procedures, maintenance contacts, supplier lists, shift patterns and ten real requests such as fault reports or schedule emails. Everything is due within 72 hours of the order. After that, plan about an hour to review the test results with your planner and a supervisor, plus the written handover report.
Order AI Operations Assistant for Manufacturing and on a fixed delivery date schedule requests, downtime, supplier chases and shift handovers are tracked in one place for your plant team.



Collects daily updates across teams and flags issues needing attention.